PAWSPIRE Pet Supply
🐶 Freedom Summer Training Bundle – Long Lead, Slow Feeder, Treat Bag, Clicker+ 3 Poop Bag Rolls
🐶 Freedom Summer Training Bundle – Long Lead, Slow Feeder, Treat Bag, Clicker+ 3 Poop Bag Rolls
Couldn't load pickup availability
🐾 Train with Freedom – Dog Training Essentials Bundle
Let your dog explore with confidence.
Perfect for training, hiking, or recall practice—this all-in-one bundle gives your dog freedom while keeping safety, control, and enrichment top of mind.
🎁 What’s Inside:
🦮 20m Reflective Training Lead (x1)
Give your dog room to roam while you stay in control.
-
Long 20m (65ft) length for recall, hiking & open-space training
-
Reflective stitching for visibility in low light
-
Foam-padded handle for comfort & no rope burn
-
Weather-resistant nylon with anti-tangle round rope design
-
Strong metal clip secures to any harness or collar
🎒 Multipurpose Treat Bag (x1)
Keep treats and essentials on hand—no more fumbling.
-
Durable cationic linen with a water-resistant lining
-
Multiple pockets for treats, toys, keys, and cards
-
Wear crossbody or on your waist with included straps
-
Built-in poop bag dispenser for on-the-go convenience
-
Reflective strip adds visibility during early or late walks
🍽️ Silicone Slow Feeder Mat (x1)
Encourages calm, healthy eating post-training or walks.
-
Food-grade, BPA-free silicone—safe and easy to clean
-
20 suction cups keep it in place inside any bowl
-
Slows fast eaters to reduce bloating and gulping
-
Flexible, removable, and dishwasher safe
🎯 Clicker Training Tool (x1)
Train faster with clear, consistent communication.
-
Ergonomic design fits comfortably in your hand
-
Crisp sound for instant reinforcement
-
Comes with wrist coil and clip for easy access anywhere
-
Ideal for teaching commands, tricks, or reducing bad habits
🌈 Rolls of Rainbow Poop Bags (x3)
Eco-friendly clean-up that’s actually fun to use.
-
Bright, cheerful colours—ditch the boring black bags
-
Thick and leak-proof (0.015mm) for zero mess
-
Each roll includes 15 bags, biodegradable and easy to tear
⭐ Why This Bundle Works:
✅ Safer long-lead walking & recall training
✅ Promotes better digestion with slow feeding
✅ Supports hands-free, reward-based training
✅ Built to last with weather-resistant materials
✅ Adds style, convenience & sustainability to your routine
💰 Bundle Price: £39.99
RRP: £50.83 – Save 20%!
Share


















