Skip to product information
1 of 19

PAWSPIRE Pet Supply

🐶 Freedom Summer Training Bundle – Long Lead, Slow Feeder, Treat Bag, Clicker+ 3 Poop Bag Rolls

🐶 Freedom Summer Training Bundle – Long Lead, Slow Feeder, Treat Bag, Clicker+ 3 Poop Bag Rolls

Regular price £39.99 GBP
Regular price £50.83 GBP Sale price £39.99 GBP
Sale Sold out
Taxes included.
Quantity

🐾 Train with Freedom – Dog Training Essentials Bundle

Let your dog explore with confidence.
Perfect for training, hiking, or recall practice—this all-in-one bundle gives your dog freedom while keeping safety, control, and enrichment top of mind.


🎁 What’s Inside:

🦮 20m Reflective Training Lead (x1)

Give your dog room to roam while you stay in control.

  • Long 20m (65ft) length for recall, hiking & open-space training

  • Reflective stitching for visibility in low light

  • Foam-padded handle for comfort & no rope burn

  • Weather-resistant nylon with anti-tangle round rope design

  • Strong metal clip secures to any harness or collar

🎒 Multipurpose Treat Bag (x1)

Keep treats and essentials on hand—no more fumbling.

  • Durable cationic linen with a water-resistant lining

  • Multiple pockets for treats, toys, keys, and cards

  • Wear crossbody or on your waist with included straps

  • Built-in poop bag dispenser for on-the-go convenience

  • Reflective strip adds visibility during early or late walks

🍽️ Silicone Slow Feeder Mat (x1)

Encourages calm, healthy eating post-training or walks.

  • Food-grade, BPA-free silicone—safe and easy to clean

  • 20 suction cups keep it in place inside any bowl

  • Slows fast eaters to reduce bloating and gulping

  • Flexible, removable, and dishwasher safe

🎯 Clicker Training Tool (x1)

Train faster with clear, consistent communication.

  • Ergonomic design fits comfortably in your hand

  • Crisp sound for instant reinforcement

  • Comes with wrist coil and clip for easy access anywhere

  • Ideal for teaching commands, tricks, or reducing bad habits

🌈 Rolls of Rainbow Poop Bags (x3)

Eco-friendly clean-up that’s actually fun to use.

  • Bright, cheerful colours—ditch the boring black bags

  • Thick and leak-proof (0.015mm) for zero mess

  • Each roll includes 15 bags, biodegradable and easy to tear


Why This Bundle Works:

✅ Safer long-lead walking & recall training
✅ Promotes better digestion with slow feeding
✅ Supports hands-free, reward-based training
✅ Built to last with weather-resistant materials
✅ Adds style, convenience & sustainability to your routine


💰 Bundle Price: £39.99
RRP: £50.83 – Save 20%!

View full details